Disaster recovery preparation is not the same as a DR planJanuary 22, 2013
One of the things that I think happens in the general area of disaster recovery is that the terminology gets confused (partly because a lot of people, myself included, sort of have their toes near the water without actually being specialists). Because some of my views about disaster recovery plans turn on what I consider a DR plan to involve, I want to write down my views. (I've sort of mentioned them in passing a couple of times recently but I feel like making things explicit.) So I'll start with my view of the terminology:
My feeling is that some degree of DR preparation is easy and relatively general; you don't have to consider very many scenarios in order to set up things like offsite backups. I have mixed feelings about abstract DR plans, part of which boil down to 'documentation needs to be tested' (which is obviously hard for an abstract plan). Actual real and concrete DR plans have a lot of requirements that I think makes them hard for many organizations; among other things they need preallocated resources and for their efforts to be meaningful. (Note that organizations that take their DR plans and procedures seriously do periodically run tests of them; you really have to, in order to be sure that the plans will work when they're really needed. If your organization 'takes DR seriously' but has never done or budgeted for such a test, you know how seriously it really takes this.) I have a grumpy reaction to people who go on about how everyone should have DR plans or at least seriously consider DR issues because I think their efforts are driving people away from simple disaster recovery preparations. If you phrase things so that you bundle DR preparation into DR plans and then your description of what's involved in DR planning convinces people that it is too big (and too expensive) for their environment, you are not doing them any favours. (Of course all of the consultants and DR firms and so on make almost all of their money from actual relatively concrete DR plans, not from simple DR preparation, so they have very little motivation to separate the two things and advise people start with simple steps before going all the way to expensive DR activities. But I am starting to rant here.) Sidebar: the cynical reason for DR plans to existPut simply, DR plans are a blame deflection method for when disaster strikes and things explode. If you ordered your underlings to prepare a DR plan and the DR plan fails, you can generally deflect the resulting blame on to your underlings. In the mean time you can assure the auditors (and your management, if any) that you've considered the issue and you have a plan, honest. (As always and as before, an organization's actual priorities are shown by what it does, not by what it says that it wants.) |
These are my WanderingThoughts GettingAround This is part of CSpace, and is written by ChrisSiebenmann. * * * Atom feeds are available; see the bottom of most pages. Categories: links, linux, programming, python, snark, solaris, spam, sysadmin, tech, unix, web |